On a Greek island, peak demand and the lead time of a replacement part can make the same outage more costly in summer. Start with the good output your plant has demonstrated and count the production hours it can realistically add. Compare a spare machine with extra time or a compatible support arrangement.
Turn the stock gap into a capacity brief
Record the forecast window, available stock, planned output and additional demand if the main machine is unavailable. Include how quickly any proposed equipment or spare can reach the site and when an installer could make it available.
| Input | Example | Your plant |
|---|---|---|
| Good units per hour on backup | 1,500 | ___ |
| Additional verified running hours | 10 | ___ |
| Extra packs under those conditions | 15,000 | ___ |
| Needed date, island freight and installation | Confirm locally | ___ |
Check the island site and freight route for the backup equipment
Discuss bottling capacity for the summer
Send island location, package, verified rate and when the spare capacity must be ready.